TECHNOPARK Phase III is located in 92 acres of land adjacent to the TECHNOPARK PHASE-I Campus The Government of India has granted Special Economic Status for 27.5 acres of land.TECHNOPARK has already commenced construction of 10 lakhs sqft IT Building in this campus.

A 110/11 KV substation has already been commissioned in the campus. TECHNOPARK currently in the process of creating infrastructure including internal roads, power, water distribution systems and other amenities.

Master Plan


FACT SHEET


  • Project Area - 92 acres

  • 10 kms from Trivandrum City

  • 8 kms from Trivandrum International Airport

  • Type of Development : SEZ/ Non-SEZ

  • Basic Infrastructure - Power, Water. Roads, Telecom, Datacom, Sewage Treatment Plant, Utility Building, Food Court, etc


OFFERINGS


  • SEZ/ Non-SEZ land parcels available for IT/ITES Companies and/or developers on long lease

  • SEZ built-up area available on monthly rental basis to be ready by end of September 2013.


A. TECHNOPARK PHASE III(updated on 29.08.2013)


I. WORKS IN PROGRESS



1). Construction of IT Building complex.


2).Structural glazing work on progress:




3) Electrification Of IT Building


Present Status

  • Circuit wiring for light and power circuit work in progress

  • Lift panels and Lift DB fixing completed.

  • Lift cabling and earthing work in progress

  • BBT installation work in progress.

  • Tap off box and MCCB fixing work in progress.

  • LT panels are positioned in Substation.

  • HT panel positioned in Substation.

  • DG installation and exhaust pipe work completed.


4).Lift panel and DB installed in 11th floor Electrical room Tower A






5).Air conditioning and Ventilation system for I.T. Building


Present Status

  • Duct erection - Nearing completion .

  • AHU Erection - 90 % completed.

  • TFA errection - Nearing completion.

  • TFA errection - Nearing completion.

  • Stair case pressurization- Nearing completion.

  • Shaft piping - Completed.

  • Chemical dosing completed.

  • Electrical tray work started in Ground and basement floor in progress.

  • Insulation of piping started.

  • Tower Band A 12 nos TFA erection completed.






6) Construction of overhead tanks, Ground level reservoir and associated pumping and piping system


Present Status

  • Site office Work started at Second floor of IT Building.

  • Drawing approval is on process.

  • Technical submittals submission and approval is on progress.


7) Water Distribution System


Present Status

  • Structure Completed.

  • Water proofing work completed.

  • Plumping work in progress.


8).OVER HEAD TANK & Sump work on progress.




9) Supply, Installation, Testing & Commissioning of Elevators


Present Status

  • All lifts are nearing commissioning.


10) LIFT Equipment.




11) 11 KV Power Distribution System


Present Status

  • Power distribution system commissioned and energized




12) Sewage Treatment Plant

Present Status

  • Civil works are nearing completion.



13) Fire Protection System


Present Status

  • Pipe Fabrication and erection works nearing completion.

  • Shaft piping works are 90% complete.

  • Fire alarm cable laying works nearing completion.

  • Ground and Basement floor sprinkler pipe erection 85% completed.

  • Outer periphery yard hydrant pipe bitumen coating and wrapping coating 80% completed and GI pipe laying 80% completed.

  • 2nd to 11th floor lobby area multi sensor detector fixing completed.

  • Basement, Ground floor lobby area multi sensor detector fixing 90% completed. Basement floor heat detector fixing 90% completed and Ground floor heat detector fixing 50% completed.



14) Construction of Roads,Trenches and pathways


Present Status

  • Earth filling 80% completed.

  • Black topping Work in progress around IT building.

  • Road side trench work in progress




15) SOFT LANDSCAPING WORK IN TECHNOPARK PHASE III


Present Status

  • Red earth filling in progress

  • Grass planting in progress.



16) SBC Works in 2nd & 3rd Floors


Present Status

  • Interior furnishing works in progress.

  • Electrification works in progress.

  • HVAC works in progress.


STATUS OF OTHER WORKS



1.Rain water harvesting

Tender document is under preparation

2.Structural Glazing Cleaning system

The work has been tendered.

3. Solar Street light.

Tender documents are finalized.